Data Centre Specialist

Are you Multi National Company (MNC) and looking for set up Data Centre in India / South Asia by purchasing or leasing the property?

Need a partner for –

  • Due diligence for selecting & finalizing the property as per American Society for Testing & Materials (ASTM) Standard to check environmental contamination of site under consideration, potential financial and commercial implication with EHS and if any liabilities associated with the business deal….

  • Various permissions from local concern body before operating the data centre….

  • Continuous services require to support in operation phase…. ????

If yes then please step up in “Eco foot forward” office…..

Here we can do for You -

Stage 1: Due diligence for selecting the property:

Site Development, Infrastructure, and Community Evaluation

Geotechnical Review

Natural Resources Evaluation

Environmental Assessment (ESA Phase I ASTM 1527-13)

Flood Assessment

Metro Connectivity Review

Fuel Supply Evaluation

Stage 2: Due diligence for finalized property:

Land Title Survey and Topographic Survey

Site Reconnaissance and Subsurface Investigation

Environmental Testing

Master Plan and Preliminary Engineering

Air Quality Test

Ambient Noise Level Monitoring

Stage 3: Construction phase:

Permissions from local planning body as per requirement (Building permission, Fire NOC, Environmental Permissions, etc.)

Designing, commissioning of requires Environmental Infrastructure.

Stage 4: Operation phase:

Require permission to operate data centre from local planning body as per requirement (Pollution control board, etc).

Time to time continuous environmental legal compliances

Operation & maintenance of Environmental Infrastructure.

Scroll to Top